No:

BH2022/02578

Ward:

East Brighton Ward

App Type:

Listed Building Consent

 

Address:

Madeira Terrace Madeira Drive Brighton BN2 1TN

 

Proposal:

Part restoration of the Grade II* listed Madeira Terrace (Phase 1 - consisting of the 40 arches between the Royal Crescent Steps in the west to Shelter Hall in the east), erection of a new full height single car lift, general repairs to existing Shelter Hall Lift structure and operational upgrade to Shelter hall Lift car carriage and doors together with temporary means of access at deck level, new staircase from deck level linking with Madeira Drive, permanent planting, landscaping and seating at deck level, fixings for temporary seasonal canopies at deck level, works to laundry arch, and improvements to heritage setting upon Madeira Drive including removal of 22 existing parking spaces, provision of new planted verges and associated wayfinding signage.

 

Officer:

Wayne Nee, tel: 292132

Valid Date:

25.08.2022

 

Con Area:

East Cliff Conservation Area

Expiry Date:

20.10.2022

 

Listed Building Grade: II*

EOT:

 

Agent:

NTR Planning 118 Pall Mall London SW1Y 5EA

Applicant:

Brighton & Hove City Council Hove Town Hall Norton Road Hove BN3 3BQ

 

 

 

1.                RECOMMENDATION

 

1.1.          That the Committee has taken into consideration and agrees with the reasons for the recommendation set out below and resolves to GRANT Listed Building Consent subject to the following Conditions and Informatives.

 

Conditions:

1.         The works hereby permitted shall be commenced before the expiration of three years from the date of this consent.

Reason: To comply with Sections 18 (as amended) and 74 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

 

2.         A formal recording of the parts of the historic structure under the scope of the Phase 1 works hereby permitted, including the parts already replaced and removed, shall be logged as a gazetteer of surviving historical features. The formal recording shall be submitted to the Local Planning Authority as a complete public record prior to first public re-use of the Madeira Terrace deck level.

Reason: The gazetteer is to form a consolidated public record of the proposed Phase 1 works. To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

3.         Prior to the dismantling of any part of the listed Madeira Terrace structure an Iron Reuse Strategy report shall be prepared referencing pre-existing investigations shall be submitted to and agreed in writing by the Local Planning Authority.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

4.         The proposed area of the application site marking the extent of the initial works (Section 1) of the proposed Phase 1 works herby permitted shall extend to no less than 4 arch bays in width. Details of the chosen location of the section 1 of phase 1 shall subsequently be submitted alongside applicable condition details referencing the section 1 works.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

5.         Prior to the dismantling of any part of the listed Madeira Terrace structure, an outline method statement for the removal of the existing concrete deck shall be submitted to and agreed in writing by the Local Planning Authority, and works shall be carried in full accordance with the approved details, and any deviation in the remainder of the phase 1 works from the approved shall require to be submitted in full and agreed in writing with the Local Planning Authority prior to implementation of those works.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

6.          

(a)     Prior to any restoration works to the dismantled Madeira Terrace structure, a condition survey submitted in respect of section 1 of Phase 1 of the structure (following dismantling and workshop inspection) shall be submitted to and approved in writing by the Local Planning Authority. The condition survey shall include details of dismantling of the ironwork and the condition of all elements.

(b)     Prior to reconstruction of section 1 of Phase 1 of the dismantled Madeira Terrace structure, a full methodology for repair and replacement detailing all interventions to be carried out, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include a photographic condition record of each component at the point of assessment in the workshop and post- repair, and interventions carried out including the elements of new fabric. The scheme shall be developed with the input of an ironwork specialist/conservator and carried out in full in accordance with the approved details, and any agreed material deviation in the remainder of the phase 1 works from the approved shall require to be submitted in full and agreed in writing with the Local Planning Authority prior to implementation of those reconstruction works.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

7.         Prior to incorporation and installation of newly cast, cast iron elements, including (lattice) trusses, columns and balustrades, a minimum of one sample of each shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be carried out in full in accordance with the approved details and retained as such thereafter.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

8.         Prior to first public re-use of the restored Madeira Terrace deck level hereby permitted, full details of the proposed canopies, including height, coverage, method of attachment/fixing, means of storage, and visuals to indicate their visibility, shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter. The deck level canopies shall be used seasonally between the 1st April and the 30th September (inclusive) in any calendar year and shall be removed and stored outside of these dates.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

9.         Prior to first public re-use of the restored Madeira Terrace deck hereby permitted, full details of the wayfinding and historic building signage shall be submitted to and approved in writing by the Local Planning Authority. The signage shall be erected and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

10.      No works to the Laundry Arch shall take place until full details of the external alterations of the Laundry Arch, including windows, doors and balustrade, have been submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

11.      Prior to first public re-use of the restored Madeira Terrace deck level hereby permitted:

i)        details of lighting to public realm, which shall include details of; location and design, levels of luminance, hours of use, predictions of both horizontal illuminance across the site and vertical illuminance affecting immediately adjacent receptors, hours of operation, details of fittings and fixings and details of maintenance shall be submitted to and approved in writing by the Local Planning Authority.

ii)       the predicted illuminance levels shall have been tested by a competent person to ensure that the illuminance levels agreed in part 1 are achieved. Where these levels have not been met, a report shall demonstrate what measures have been taken to reduce the levels to those agreed in part i). The lighting shall be installed, operated and maintained in accordance with the approved details and thereafter retained.

Reason: To ensure a satisfactory appearance to the development and to safeguard the amenities of the occupiers of adjoining properties, to comply with policies DM26 and DM27 of City Plan Part Two, and HE1, HE6, QD25 and QD27 of the Brighton & Hove Local Plan.

 

12.      No restoration/repair works to Shelter Hall lift shall take place until a general conditions survey relating to the shelter hall lift has been submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

13.      No restoration/repair works to Shelter Hall lift shall take place until full details of the new lift car interior have been submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

14.      No restoration/repair works to Shelter Hall lift shall take place until full details of the new Shelter Hall lift hydraulic system have been submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

15.      Prior to first public re-use of the Shelter Hall lift, full details of the proposed new door treatment at the Marine Parade, terrace deck entrances, and restoration of the terrace deck canopy of the existing Shelter Hall lift shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

16.      Within 3 months of first public re-use of the Madeira Terrace deck level, a Management and Maintenance Plan for the new full height lift and Shelter Hall lift shall be submitted to and approved in writing by the Local Planning Authority. The use of the lifts thereafter shall be in full accordance with the approved details.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

17.      Prior to first public re-use of the Shelter Hall lift (following these works of restoration and repair) to exit at deck level, full details of the temporary deck access walkway from the Shelter Hall lift to restored deck surface as part of Phase 1 shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out prior to first public re-use of the Shelter Hall lift and completed fully in accordance with the approved details. The temporary deck access walkway shall be removed at the time of construction of a future phase of works within this part of the terrace deck.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

18.      The exposed metalwork of the core structure and associated balustrading and keystone mask detailing shall be painted with ‘Brighton & Hove turquoise and cream paint colour’ scheme and retained as such thereafter. Any material deviation from this shall require full details to be submitted and approved in writing by the Local Planning Authority prior to implementation of those repainting works.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

19.      Prior to first public re-use of the restored Madeira Terrace deck level hereby permitted, sample details of the finishing treatment of the Madeira Terrace pre-cast concrete deck, including colour, aggregate wearing course for the deck, and method of application for the finishing treatment shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

20.      No works to the East Cliff Wall within Section 1 of the Phase 1 shall take place until full details of treatment to the repaired cliff face in terms of method of exposed surface repair, materials used, method of application of exposed surface finish and colour have been submitted and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

21.      Prior to public re-use of the restored Madeira Terrace deck hereby permitted, full details (including siting, height and materials) of the temporary boundary treatment at either end of the restored terrace deck, to include a degree of permeability of wider deck beyond, shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained and retained as such thereafter, and subject to removal via any adjacent phases of restoration to the remainder of the terrace deck.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

22.      Full details of any temporary pedestrian access during construction (where deemed necessary), including, where necessary, any details of minor temporary works to the western arm of the Royal Crescent Steps to facilitate safe temporary pedestrian access, shall be submitted to and approved in writing by the Local Planning Authority. In the event of temporary works to the western steps being undertaken these works shall be carried out and completed fully in accordance with the approved details.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

23.      Prior to public re-use of the restored Madeira Terrace deck hereby permitted, full sample details of the ground level hardstanding within Madeira Drive and lower terrace promenade walkway, shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details and maintained as such thereafter.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

24.      No ground works to the proposed new full height lift hereby permitted shall commence until samples of all materials to be used in the construction of the external surfaces of the new lift have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details and maintained as such thereafter.

Reason: To ensure a satisfactory appearance to the development and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

25.      No ground works to the proposed new full height lift hereby permitted shall commence until full design details of the exterior of new lift, including final design of the hit and miss brickwork pattern and associated lighting behind, have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details and maintained as such thereafter.

Reason: To ensure a satisfactory appearance to the development and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

26.      Prior to restoration works to the eastern arm of Royal Crescent Steps hereby permitted, full details of the restoration works, including details of the handrails, lighting, and contrasting nosing’s to be added to the step treads (if applicable), shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out and completed fully in accordance with the approved details prior to restoration works to the eastern arm of Royal Crescent Steps.

Reason: To ensure the satisfactory preservation of this listed structure and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

27.      No works to the proposed new single flight staircase from deck level linking with Madeira Drive hereby approved shall commence until full sample details of the new staircase, including sample details of balustrade panels and brickwork, have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details and maintained as such thereafter.

Reason: To ensure a satisfactory appearance to the development and to comply with Policy DM27 of City Plan Part 2 and policies HE1 and HE4 of the Brighton & Hove Local Plan and CP15 of the Brighton & Hove City Plan Part One.

 

28.      Prior to first public re-use of the restored Madeira Terrace deck level hereby permitted, full details (including samples) of the proposed public realm improvement scheme shall be submitted to and approved in writing by the Local Planning Authority. The submission shall include details with regards layout, materials, colour palate, signage, street furniture, and infrastructure for future pop-up events. The maintenance details and future management plan are also required. The development shall be carried out in accordance with the approved details and maintained thereafter.

Reason: In order to ensure a satisfactory appearance and to accord with the requirements of SA1 the Seafront, Policy CP13 and CP15 of the City Plan Part 1.

 

Informatives:

1.         This decision is based on the drawings listed below:

Plan Type

Reference

Version

Date Received

Proposed Drawing

503-LPL-XX-01-DR-L-0002

P3

30 August 2022

Proposed Drawing

240462-PUR-01-01-DR-A-2022

P05

30 August 2022

Proposed Drawing

240462-PUR-01-GR-DR-A-2021

P05

30 August 2022

Proposed Drawing

240462-PUR-01-ZZ-DR-A-2028_P05

P05

30 August 2022

Proposed Drawing

240462-PUR-01-01-DR-A-5000

P03

12 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0001

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0021

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0022

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0031

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0032

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0051

P4

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0054

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0055

P2

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0100

P3

30 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0102

P2

12 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0103

P2

12 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0105

P2

30 August 2022

Proposed Drawing

503-LPL-XX-01-DR-L-0200

P2

12 August 2022

Proposed Drawing

503-LPL-XX-01-DR-L-0201

P2

12 August 2022

Proposed Drawing

503-LPL-XX-01-DR-L-0202

P1

12 August 2022

Proposed Drawing

503-LPL-XX-01-DR-L-0203

P2

12 August 2022

Proposed Drawing

503-LPL-XX-00-DR-L-0101

P3

30 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-C-0501 S0

P3

12 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0301

P3

12 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0211

P3

12 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0212

P3

12 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0213

P3

12 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0214

P3

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-1036

P04

30 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2024

P05

30 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2026

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2031

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2032

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2040

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2041

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2042

P04

12 August 2022

Proposed Drawing

MTR-PUR-01-ZZ-DR-A-2045

P03

12 August 2022

Block Plan

503-LPL-XX-00-DR-L-0000

P3

30 August 2022

Proposed Drawing

MTR-HOP-01-ZZ-DR-S-0601

P2

12 August 2022

Location Plan

240462-PUR-00-XX-DR-A-0005

P02

25 August 2022

Proposed Drawing

240462-PUR-00-ZZ-DR-A-1000

P03

25  August 2022

 

 

2.               SITE LOCATION

 

2.1.          The application relates to 40 arches (arches 78-117a) of Madeira Terrace between the Royal Crescent Steps to the west and including Shelter Hall/Concorde 2 to the east. The site area is 0.42 hectares in area and also includes part of Madeira Drive highway in front of this section of Madeira Terrace.

 

2.2.          Madeira Terrace is a Grade II* listed building in the East Cliff Conservation Area. It is a cast iron arcade at beach level with walkway over, connected to Marine Parade above by sets of steps at intervals along its length, and by the Madeira Lift towards its eastern end, the tower for which rises above the level of the sea wall and connects to a shelter hall at beach level.

 

2.3.          The wider Madeira Terrace structure is 865 metres in length stretching from Palace Pier/Old Steine to the west and Black Rock to the east. The terrace was built in the late 1880's (including extending westwards towards the old aquarium), connecting the open expanse of beach to the town above, and facilitating promenading, recreation and social gathering during the late Victorian era. The structure has a high aesthetic value from strong linearity accented by the repetitive bays and architectural detailing, as well of its three- tiered form (beach level promenade, intermediate deck and Marine Parade).

 

2.4.          Through the 20th century the Terrace has provided the grandstand for early speed trials, and the finish of the London to Brighton car rallies and bike rides, Brighton marathon, concerts and other open-air events. The structure has since degraded and was closed to the public circa 2015 due to safety concerns. The building was included on Historic England's list of buildings at risk from October 2020 following the upgrade of the structure to Grade II* listing, and is described in the Register as being in a very poor and deteriorating condition.

 

2.5.          The Shelter Hall (in use as Concorde 2 events venue) remains open, as is the eastern arm of Royal Crescent Steps. The Shelter Hall lift tower (not in use) is prominent within the conservation area and on the approach along the seafront and along Marine Parade. There is visual connection of the Terrace with sea views which it enables and also when viewed across the water as a backdrop to seashore views. The Terrace also has group value with other seaside structures and buildings including the adjacent Palace Pier and the Royal Crescent, both listed at Grade II*.

 

2.6.          The eastern half of the Palace Pier to Brighton Marina Seafront, including Madeira Drive, is an urban stretch of seafront that provides opportunity for new uses, as well as public realm and connectivity improvements. This includes seafront uses to the south including Yellowave beach sports venue, and the Sea Lanes swimming pool currently under construction at the former Peter Pan site.

 

2.7.          To the south of Madeira Drive is Volks Railway Site of Nature Conservation (SNCI) which runs to the south alongside Madeira Drive. Volks Railway is also a Local Wildlife Site (LWS), as is Madeira Drive Green Wall which is partly located within the site and the planted Japanese Spindle covers a significant part of the cliff face on this stretch of the Terrace. To the north of the site is the A259 Marine Parade public highway.

 

 

3.               RELEVANT HISTORY

 

3.1.          BH2022/02577 (Full Planning) Part Restoration of the Grade II* listed Madeira Terrace (Phase 1 - consisting of the 40 arches between the Royal Crescent Steps in the west to Shelter Hall in the east), erection of a new full height single car lift, general repairs to existing Shelter Hall Lift structure and operational upgrade to Shelter hall Lift car carriage and doors together with temporary means of access at deck level, new staircase from deck level linking with Madeira Drive, permanent planting, landscaping and seating at deck level, fixings for temporary seasonal canopies at deck level, cliff wall interventions and general repair (including physical works of protection for the Green Wall), works to laundry arch, and improvements to public realm and heritage setting upon Madeira Drive including removal of 22 existing parking spaces, provision of new planted verges, wayfinding signage, pedestrian crossings, cycle parking and associated drainage - Under Consideration.

 

3.2.          BH2021/03592 Installation of temporary propping of structural elements to bays 51 and 73 - Approved 01/12/2021

 

3.3.          BH2020/00619 Removal of existing rainwater goods and interim replacement with UPVC (retrospective). Long-term replacement with cast iron rainwater goods - Approved 21/04/2020

 

3.4.          BH2019/00098 (Lift) Installation of temporary concrete & steel propping supports to lattice beams nos. 19, 45, 58, 63, 67, 75 and 141 on Madeira Terraces - Approved 03/07/2019

 

3.5.          BH2017/02472 (Shelter Hall) Installation of internal platform within ceiling void to facilitate access to two original steel beams for inspection and maintenance purposes - Approved 18/09/2017

 

3.6.          BH2016/00563 Installation of supporting steelwork to three locations on Madeira Terraces - Approved 15/08/2016

 

3.7.          BH2015/03130 Installation of steel mesh fencing with vehicular and pedestrian gates to enclose Madeira Terrace, 3m high along Madeira Drive and 2.4m high to steps from Marine Parade - Approved 26/10/2015

 

3.8.          BH2015/03129 Installation of steel mesh fencing with vehicular and pedestrian gates to enclose Madeira Terrace, 3m high along Madeira Drive and 2.4m high to steps from Marine Parade - Approved 26/10/2015

 

3.9.          BH2012/02654 (Lift) Installation of light fittings to roof canopy and ground floor soffit with associated wiring to provide illumination around lift entrance (Part-Retrospective) - Approved 19/12/2012

 

3.10.       BH2009/02129 Structural repair works to cast iron beams, railings, post and panel along walkway - Approved 26/11/2009

 

3.11.       BH2000/00340/LB Installation of floodlights on alternate pillars - Approved 22/03/2000

 

Black Rock and Surroundings Madeira Drive

3.12.       BH2020/00442 Replacement of existing sea wall with a realigned free-standing structure; the formation of an access route from Black Rock extending to Brighton Marina; enhancement of highways infrastructure for Duke's Mound at its junctions with Marine Parade and Madeira Drive; restoration of The Old Reading Room and The Temple and change of use for flexible A1, A3, D1 or D2 Use; widespread enhancement of public realm for pedestrians and cyclists via new amenities, facilities and landscaping, with associated ecological enhancement - Approved 24/12/2020

 

3.13.       BH2020/00443 Internal and external works to The Temple and The Old Reading Room incorporating: fenestration alterations; repairs and restoration of the structure and flooring; change of use for flexible A1, A3, D1 or D2 Use; and associated works - Approved 31/03/2021

 

Former Peter Pan's Playground Site Madeira Drive

3.14.       BH2020/01018 Application for variation of conditions 1, 3 and 23 of BH2019/00293 (as amended by BH2019/03686) to allow amendments to approved drawings to include reduced number of modular building units (from 107 to 74), increased overall floorspace (from 1372sqm to 1421sqm), enlarged swimming pool (from 25m x 12m to 50m x 12m) and to allow permanent consent for swimming pool and 10 year temporary consent for modular buildings (from previous 5 year temporary consent for whole scheme) - Approved 17/03/2021

 

3.15.       BH2019/00293 Erection of outdoor swimming pool (25m x 12.5m) and changing/plant rooms (D2 use), flexible events space (D2 use) and 1-2 storey relocatable modular buildings with first floor deck to provide mixed leisure/retail/food/drink/office uses (D2/A1/A3/A4/A5/B1 uses) with associated cycle parking, refuse storage, landscaping, boundary treatment and retractable beach mat. Temporary (meanwhile use) for 5 years - Approved 16/08/2019

 

3.16.       BH2018/02281 Erection of temporary buildings including first floor terrace to provide swimming training facility, sauna and changing facilities (D2 use), marketing suite/office (B1 use) and associated storage, plant and fencing, and use of land for general leisure/therapy use and pop-up events (D2/D1 uses) for temporary period of 12 months (Part retrospective) - Approved 31/01/2019

 

 

4.               APPLICATION DESCRIPTION

 

4.1.          Listed Building Consent is sought for repair and restoration to 40 arches of the Madeira Terrace between Royal Crescent steps in the west and Shelter Hall in the east, and to enable the re-opening of the structure for public realm and grandstand for events.

 

4.2.          The full proposals are summarised as follows:

 

·      Repair and restoration of 40 arches of Madeira terrace, including the cast iron metalwork, repair of Royal Crescent Steps, replacement deck structure with engineered concrete, and alter/restore balustrading with a raised height to 1100mm;

·      New full height single car lift to western end near to Royal Crescent Steps;

·      New staircase from deck level linking with Madeira Drive ground level at the eastern end of site;

·      Upgrade and repair of existing Shelter Hall Lift structure including general repairs, operation of lift from marine Parade to deck level, including new lift car, new doors, reinstatement of hydraulic drive system and reinstatement of deck level entrance canopy roof;

·      Provision of temporary pedestrian access route from Shelter Hall lift to reinstated deck;

·      New seating, planting and other landscaping at deck level, including fixings for temporary seasonal canopies;

·      Reinforce cliff wall to support Madeira Terrace structure, including general repair of cliff face;

·      Protection of green wall during construction phases and enhancement including cliff wall mounted planting cassettes to encourage planting growth;

·      New lighting scheme;

·      Removal of 22 no. existing parking spaces, provision of new planted verges, wayfinding signage, pedestrian crossings across Madeira Drive, cycle parking stations, and associated drainage works.

·      Alterations and repairs to Laundry Arch to enable future operational use with replacement windows and door and a new balustrade.

 

4.3.          An associated Full Planning application (ref. BH2022/02577) is also under consideration.

 

4.4.          Pre-application advice: The development has been influenced by pre-application feedback from officers in relation to heritage impact. The pre-application process included engagement with the Design South East Review Panel. The proposals have developed further since pre-application and includes further detail on the restoration of the terrace, removal of car parking, and repurposing and rationalising of the public spaces.

 

4.5.          The applicant has undertaken pre-application consultation, including involvement with local businesses, community groups, local access groups and local heritage groups. Community engagement sessions took place in December 2021 and January 2022.

 

4.6.          Finances for the project were raised through a crowdfunding campaign in 2017, and allocation of funding in 2019 by Brighton & Hove City Council’s Tourism, Development and Culture Committee. The funding, as well as the requirement to deliver a completed section of regenerated structure has informed the scope of the proposals for this proposed development as Phase 1 of the Madeira terrace project.

 

 

5.               REPRESENTATIONS

 

5.1.          Four (4) letters of representation have been received in support of the proposed development for the following reasons:

·      like the design of the new lift

·      Reopening the Terrace and making it more accessible for local residents will create new connections for East Brighton;

·      Look forward to the new cultural events proposed for Madeira Terrace;

·      The Madeira Terrace Advisory Panel support the application for the following reasons:

·      Support the applications but have reservations on the design of the new lift tower;

·      The benefits of the major interventions in the historic fabric more than justify any adverse effects on the significance of the Terrace;

·      secures stepped and step-free access between Marine Parade and Madeira Drive at the mid-point of the whole terrace' adding to and improving access to the concentration of leisure attractions in the vicinity;

·      The interface between the restoration of the terrace and the protection and regeneration of the Green Wall is carefully considered;

·      The proposed simple reinstatement of the surface of the covered walk is in keeping and the return of seating here is welcomed;

·      The proposed reduction in parking is a step in the right direction and the enhancement to the pedestrian crossings greatly improves them as a key element in the connectivity between Marine Parade and the beach.

 

6.               CONSULTATIONS

 

External

6.1.          Conservation Advisory Group: Objection

The principal objection was the inclusion of the new lift the design of which is not attractive and will harm the longer views of the Terraces. Could the restoration be completed without the new lift as the style and design is not acceptable? Views from within CA are harmed and the setting of the listed Royal Crescent. Perhaps a void could be left in the deck for a future installation?

 

6.2.          Connection between, and access to, the different terrace layers are important, as highlighted. Could the necessary lift structures adopt the materials and colour palette of the existing ironwork, e.g. Brighton Blue? Night-time lighting should also be conservation-led i.e. consistent, not colour changes.

 

6.3.          A very comprehensive and impressive application and the Group welcomes the intent to restore and retain. The many commercial challenges and the clear national heritage importance was recognised and acknowledged. The Group supports the approach of a benchmark containable first phase: But can measures be put in place to ensure this pilot is protected in the future from commercially-led changes and that lessons learned in the pilot are replicated in subsequent phases?

 

6.4.          Historic England: Comment

Historic England supports the applications on heritage grounds. We consider that the applications meet the requirements of the NPPF, in particular paragraph numbers 195,199, 200 and 202.

 

6.5.          Madeira Terrace is today in a very poor and deteriorating condition, with its structural instability a serious concern that has caused the 170 bays to be closed to the public since 2015. It is listed at Grade II* and is on Historic England's Heritage at Risk Register. Historic England therefore welcome these proposals to start a process to repair, restore and re-use Madeira Terrace primarily for the purpose for which it was designed i.e. as a grandstand for spectators and as an outdoor events venue. We are also supportive in principle of the proposed approach to the conservation and repairs of the cast iron structure. Overall, Historic England consider this to be a positive conservation-led scheme that once implemented would deliver significant heritage benefits, as well as starting the process to remove this important heritage asset from our Heritage at Risk Register.

 

6.6.          It is appreciated that for the scheme to be successful and help with the regeneration of the Eastern Seafront, there would need to be additional lifts, and that the proposed lifts are of a size that is required to meet modern standards. The addition of these vertical interventions would cause some harm to the appearance of Madeira Terrace, which is essentially a horizontal structure, but it is understandable they are necessary to bring the structure back into full active use. Some of the harm may be reduced with a lift design that is more lightweight and transparent in appearance and with an upper element that is more in keeping with the exuberant and playful character of the existing kiosks and pavilions along Brighton's seafront. However, the relatively low level of harm caused by this aspect of the proposal within the context of the structure as a whole is, in our view, considerably outweighed by the significant heritage benefits associated with the restoration and re-use of this section of Madeira Terrace.

 

6.7.          The Victorian Society: No Objection

The Victorian Society featured the building as one of its Top Ten Endangered Buildings in 2015 and has been concerned about its future and development for some time. The Victorian Society are extremely pleased to welcome these considered proposals for restoration and welcome the detailed analysis that has been done on the structure as requested when consulted. While some harm would arise from the loss of the original structure through the proposed replacement deck, it is recognised that like for like replacement is not reasonable in a marine environment. Likewise, the works to the existing lift, Royal Crescent stairs, laundry arch and proposed new staircase are all acceptable. In principle the proposed new lift is acceptable. However, the Committee believe the design could be improved in relation to the existing historic structures.

 

6.8.          Currently, the shelter lift designed by Lockwood is the only one on the terrace and thus a defining and highly significant feature. It is essential its prominence is preserved if other lifts are created. This prominence should be preserved by an appropriate scale and design of the new lift which is subservient and reflects the historic lift. The Committee recognised that the proposed design has distilled some of the features of Lockwood's original designs, but this could be improved.

 

6.9.          The Victorian Society is pleased to support the proposed restoration of Madeira Terrace and is glad that a positive proposal has come about after so much debate about the future and use of the structure.

 

Internal

6.10.       Heritage : No Objection

As the first phase of a long-term project to restore and regenerate the full length of the Terrace, this proposal is considered to represent an appropriate approach to repair and regeneration of the structure, the material palette and the approach to public realm and event space that could also be applied to future phases.

 

6.11.       The proposed use for an outdoor events space and recreation space for the adjacent community, is in line with the original vision for this structure and is considered fully appropriate.

 

6.12.       The Heritage Team supports the proposed approach to the restoration of the ironwork by careful dismantling and recording to allow repairs and redecoration under controlled conditions for greater longevity. The overarching approach of retention rather than renewal is welcomed, and the proposed gas welding system would reduce the need for re-casting thereby aligning with this methodology.

 

6.13.       Welcome enhancement works are included such as reinstatement works to the Madeira lift tower to rectify disfiguring elements of past poor repairs, likewise the effect of piecemeal patching of the cliff wall will be improved with a mineral paint finish. Increased seating and landscaping works will also benefit the setting.

 

6.14.       Architectural interventions to enhance essential functions such as improved pedestrian access and events support involve change, most notably a new lift structure. These have impacts on the heritage values of the structure, other nearby heritage assets and the East Cliff Conservation Area, and should be balanced against the public gains that will result from the scheme.

 

 

7.               MATERIAL CONSIDERATIONS

 

7.1.          In accordance with Section 38 (6) of the Planning and Compulsory Purchase Act 2004, this decision has been taken having regard to the policies and proposals in the National Planning Policy Framework, the Development Plan, and all other material planning considerations identified in the "Considerations and Assessment" section of the report

 

7.2.          The development plan is:

·      Brighton & Hove City Plan Part One (adopted March 2016)

·      Brighton & Hove Local Plan 2005 (retained policies March 2016);

·      East Sussex, South Downs and Brighton & Hove Waste and Minerals Plan (adopted February 2013);

·      East Sussex, South Downs and Brighton & Hove Waste and Minerals Sites Plan (adopted February 2017);

·      Shoreham Harbour JAAP (adopted October 2019).

 

7.3.          Due weight has been given to the relevant retained policies in the Brighton & Hove Local Plan 2005 according to their degree of consistency with the NPPF.

 

 

8.               POLICIES

The National Planning Policy Framework (NPPF)

 

Brighton & Hove City Plan Part One

SS1 Presumption in Favour of Sustainable Development

SA1 The Seafront

CP12 Urban Design

CP15 Heritage

 

Brighton and Hove Local Plan (retained policies March 2016):

HE1 Listed Buildings

HE3 Development Affecting the Setting of a Listed Building

HE4 Reinstatement of original features on listed buildings

HE6 Development within or Affecting the Setting of Conservation Areas

 

Brighton & Hove City Plan Part Two

The Inspector published her Final Report into the Examination of the City Plan Part Two 19 July 2022. The Report is a material consideration. The Inspector has concluded that with her recommended changes (the schedule of changes as appended to the Report) that the Plan is sound and can be adopted. The Inspector's report concludes the examination of City Plan Part Two. City Plan Part Two policies, as amended by the Inspector's schedule of Main Modifications, can be afforded significant weight but they will not have full weight until the City Plan Part Two is formally adopted.

 

DM26 Conservation Areas

DM27 Listed Buildings

DM29 The Setting of Heritage Assets

 

Supplementary Planning Documents:

SPD09 Architectural Features

 

Background Documents:

Madeira Drive Regeneration Framework

 

 

9.               CONSIDERATIONS & ASSESSMENT

 

9.1.          Policy SA1 (The Seafront) of CPP1 seeks proposals which provide a year-round, sport, leisure and cultural role which complement its outstanding heritage and landscape value. The site lies within that part of the seafront defined as 'East of the Palace Pier to the Marina' which is identified as a centre for sports and family-based activities. The policy seeks to safeguard Madeira Drive as an important event space for which it is a unique location. Policy SA1 (The Seafront) states that the council will work in partnership to ensure the on-going regeneration and maintenance of the seafront in an integrated and co-ordinated manner.

 

9.2.          CPP1 Policy SA1 The Seafront - includes the following relevant seafront wide priorities:

·      Enhance and improve the public realm and create a seafront for all;

·      Promote high quality architecture, urban design and public art which complements the natural heritage of the seafront and preserves and enhances the character and appearance of the Conservation Areas, and the historic squares and lawns that adjoin the seafront;

 

9.3.          A masterplan is under preparation to support the implementation of Policy SA1 and SSA5 with a clear vision and coordinated approach as schemes come forward in the Eastern Seafront area. The Eastern Seafront Masterplan SPD is currently at issues and options stage, with stakeholder consultation having taken place.

 

9.4.          The proposal is for the intended first phase of the restoration, repair and regeneration of the Madeira Terraces. This encompasses arches to the west of Shelter Hall (Concorde 2) up to the Royal Crescent Steps. It has been identified that these 40 arches have high heritage value as one half off the original terrace structure and has a lower capacity for change in the eastern end of the Terrace. The eastern end is deemed to be more appropriate for priority for repair, given the structure's classification of being on the 'At Risk Register', to ensure optimum restoration of the original structure. There is also a wider cluster of activity and businesses within this section, and there is the opportunity to support footfall to the existing business at Shelter Hall (Concorde 2) and elsewhere in the vicinity. It is therefore supported that this section of the Terraces comes forward as the first phase of the wider development.

 

9.5.          Policy SA1 sets out as specific priorities for the east of Palace Pier to Brighton Marina section of the seafront; the need for an improved public realm and the conservation and enhancement of the historic and nature conservation features present in this location; and the need to improve beach and seafront access for pedestrians and cycle users, linking with access improvements at the Marina/Black Rock. In principle, the proposed development would accord with the identified priorities for this section of the Seafront. The proposed restoration and regeneration of this site, which is a key strategic objective of the city council, with its original intent and purpose is welcomed. It would also compliment the other developments underway in this section of the seafront, including the Black Rock enabling project and public realm works, as well as the Sea Lanes development to the south.

 

9.6.          The following Policy SA1 priorities are relevant to the proposals for the public realm and transport proposals:

·      Deliver the regeneration of Madeira Drive as a centre for sports and family-based activities supported by a landscaping and public art strategy which also provides for an improved public realm and the conservation and enhancement of the historic and nature conservation features present in this location;

·      Safeguard the vibrant and important event space at Madeira Drive as this presents a unique location for a mix of cultural, sport and leisure activity to take place; and

·      Improve beach and seafront access for pedestrians and cycle users, linking with access improvements at the Marina/Black Rock.

 

9.7.          City Plan Part 2 Policy DM15 Commercial and Leisure Uses on the Seafront indicates that the council will encourage temporary uses which help animate and activate vacant buildings or sites before regeneration/ construction commences and CPP2 Policy SSA5 at part h) encourages a variety of temporary/ pop up uses consistent with the area's role as a centre for cultural, sports and family based activities.

 

9.8.          As the proposals are for a restoration project to bring the terraces back into use as a linear public space/ grandstand for events, there is no proposed material change of use. The proposals to improve accessibility to the terraces as Open Space is welcomed and would be in conformity with Part 2 of Policy CP16. Policy SSA5 of CPP2 sets out that a Council priority is the successful regeneration of Madeira Drive to create a 'seafront for all' that features diverse and engaging attractions for residents and visitors. The proposed retained use is for open recreation and outdoor events space (the submission includes plans for accommodating long-standing events on Madeira Drive), including opportunity for pop-up events and activities (such as cultural/street performances, classes, private hire, and mobile food/retail traders). This would accord with the wider policy priorities for this section of the seafront set out within Policy SA1, Policy CP13 and City Plan Part 2 Policy DM15. Future activity involved with the use of the terrace may evolve overtime, and separate planning applications may be required thereafter.

 

9.9.          The restoration of Madeira Terrace would help support the continuing regeneration of the eastern seafront, help support major events on Madeira Drive, and would bring the public space back into use for residents and visitors. Improving the quality, accessibility and legibility of the public urban realm in this location would also meet the aims of CPP1 Policy CP13 Public Streets and Spaces. In principle the proposed improved pedestrian links are welcomed and would generally accord with the identified priorities for the Seafront and for this section of the Seafront (SA1 The Seafront).

 

9.10.       Policy SSA5 states that the Council is committed to the retaining, restoring and reactivating the Grade II* listed structure, and that the renovation of Madeira Terrace will need to be sensitive to the structure's unique heritage and will need to be commercially viable in order to pay for its long-term maintenance. The proposals for dismantling, repairing and reinstating the cast iron structure (including replacing the terrace deck) are considered in detail later in this report.

 

9.11.       This application has been submitted in advance of the adoption of an overarching Eastern Seafront masterplan SPD, and therefore it is important the proposals align with the key issues and aims of this SPD, including improved accessibility and north-south connectivity from Marine Parade to beach level, public realm/event space improvements and the approach to lighting and way- finding. The considerations of these are detailed in this report.

 

9.12.       There are heritage sensitivities of the site as Madeira Terrace (including Shelter Hall and lift tower) is Grade II* listed and set within the East Cliff Conservation Area, which is characterised by Regency terraces (including Grade II* Royal Crescent) to the north of Marine Parade overlooking the lower esplanade, the shingle beach and sea. There are also a number of listed buildings/structures within the wider seafront and within the Conservation Area, including Banjo Groyne (Grade II), Palace Pier to the west (Grade II*), the Grade II listed Seafront Railings running the length of Marine Parade, and various seafront elements including Grade II listed lampposts and the Grade II listed seafront shelter adjacent to the Shelter Hall lift tower. The size and linear form of the structure can be viewed well from Palace Pier to the west and the Banjo Groyne to the east.

 

9.13.       CPP2 Policy SSA5 Madeira Terrace and Drive states that proposals will be required to respect the significance of the Grade II* Madeira Terrace and other associated designated and undesignated heritage assets, prioritising their repair and restoration and meet the site-specific requirements set out in the Policy. Policy DM27 (Listed Buildings) aims to protect the special architectural or historic interests of listed buildings, having particular regard to historical associations that the building has and the use of materials which are appropriate historically, functionally and aesthetically. CPP2 policies DM26 & DM29, CPP1 Policy CP15 and Saved local policies HE1, HE3 and HE6 also apply here. A Heritage Impact Assessment has been submitted as part of the application, which has been informed by a Draft Conservation Management Plan for Madeira Terrace.

 

9.14.       In considering whether to grant planning permission for development which affects a listed building or its setting, the Council has a statutory duty to have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses. Moreover, when considering whether to grant planning permission for development in a conservation area the Council has a statutory duty to pay special attention to the desirability of preserving or enhancing the character or appearance of the area.

 

9.15.       Case law has held that the desirability of preserving a listed building or its setting or any features of special architectural or historic interest it possesses, and the desirability of preserving or enhancing the character or appearance of a conservation area should be given "considerable importance and weight".

 

9.16.       Overall, the Council Heritage Team and Historic England are in support of and welcome the proposed development, with any identified adverse harm outweighed by the benefits of the proposal. This is subject to submission of detailed design to be assessed further by condition as outlined in each element of the development below.

 

Cast Iron Structure:

9.17.       The dismantling, repairing and reinstating the cast iron structure is the fundamental development within the proposals in terms of cost and also in enabling the site to be brought back to public use. The proposed restoration work would also enable greater understanding of the works required in the wider Madeira Terrace restoration project. The submitted Design and Access Statement sets out the background to the causes of the decay of the structure, and that the recommendation is to dismantle for repair offsite using a defects recording exercise to assess and analyse the level of repair in each component. The approach would involve retaining and repairing as much of the existing listed iron structure as possible (which is welcomed), but where required elements would be replaced with a recast component. The potential for reuse will be dependent on the corrosion of individual cast iron components, and the exact condition of the cast iron structure overall will not be fully known until each section is dismantled, inspected and surveyed off-site.

 

9.18.       The repair works will overcome a number issues with the structure, including the replacement of the deck not having embedded cast ironwork that will erode, adding bearing pads for the beams into the cliff wall, new fitted bolts, and well as repairing and re-applying paint finishes in a controlled off-site workshop environment. The Heritage Team have identified the risk of damage in dismantling and then transporting the structure offsite. However, it is considered that the methodology submitted has been fully justified and the benefits to the long-term retention of as much of the structure as possible would outweigh the identified harm.

 

9.19.       Overall, the restoration of the structure to its original appearance and condition, but with adaptions, is considered a positive approach. The Heritage Team supports the proposed cast iron repair methodology and techniques. Historic England state that the proposals for restoration would have a hugely positive impact on this part of the seafront. The proposals for repair and restoration are considered to accord in principle with policies SA1 and SSA5. Given that the exact retention condition of the listed structure is currently unknown, a first section of works within the Phase 1 development will be required for dismantling, survey and repair. This will then provide a template for the repair/re-cast approach required for the remainder of the Phase 1 structure, and details of this will be required by condition. Conditions are also required to ensure the existing colour scheme is retained (having been historically associated with the structure) and for details of the colour scheme for the keystone masks that feature of the face of the ironwork arches.

 

Shelter Hall Lift Tower:

9.20.       The three-stage Madeira Lift is considered to be an early and rare example of a hydraulic, water-powered lift (later converted to electric power) in a seaside location. The structure was designed to allow the retention of the pre-existing green wall (planted between 1830 and 1833), and the attachment of the structure to the sea wall was itself considered innovative for the technology at the time. Over time the structure has been disfigured somewhat by poor repair/weatherproofing work carried.

 

9.21.       Sensitive repairs are now proposed to the brickwork and deck level canopy, as well as reinstating the copper roof, with wood roll details to match that of the upper lift roof, and to renew the flashing between the new roof and the brick lift tower. Repair and restoration are also proposed to the underside of the canopy, timber door and moulded surround, original railings, and skylight. The proposed works to the Shelter Hall lift also include provision of a new lift car, lift mechanism and doors to enable it to become operational year-round without the need to be staffed.

 

9.22.       The general restoration of the Shelter Hall structure is welcomed, as is the proposed reinstatement of the hydraulic operating system for the lift with new timber clad interior lift car to replace non-original existing car (to increase capacity). The lift would operate between and link Marine Parade and the terrace deck level, which would provide improvements to access and public realm. The re-use of the lift would require the need for a temporary walkway across the sun deck area (that would not be replaced as part of this Phase 1 application) to provide a pedestrian link between the upper deck lift entrance and the restored section of terrace. Given the circumstances, this is considered to be an acceptable temporary arrangement until the rest of the terrace is repaired. Further details of the lift, shaft and entrances restoration are to be submitted by condition.

 

Cliff Wall:

9.23.       Repair works to the facing of the East Cliff Wall are proposed to enable the installation of padstones to support the restored Terrace lattice beam bearings, as well as the new deck. Methodologies for repair are set out within the application submission. The existing weak lime-concrete coated wall would be refaced with a cement-based concrete with mineral paint finish, which would provide a more uniform appearance. These works are considered necessary for the restoration project and the Heritage Team have no objection. The works would require the Japanese Spindles to be carefully pruned, protected and propped. The ephemeral planting would be removed and returned to a 'Living Wall' system once structural works are complete.

 

New lift:

9.24.       A new lift is proposed for the western end of the site, to the east of the Royal Crescent Steps. The lift would provide improved access and connectivity through the site. The application submission provides an extensive background of the historical significance of lifts in the context of Madeira terrace, including the original design intent of the Borough Surveyor Philip Lockwood for Madeira terrace to incorporate additional lift access in the original structure.

 

9.25.       The proposed lift proposals have progressed through a rigorous process of analysis and includes significant pre-application assessment of various designs that included constructive engagement with Planning Officers and independent Design Review Panel. This has resulted in the final design which appears as a contemporary version of the existing Shelter Hall lift whilst still establishing a subservient appearance to that of the historical lift.

 

9.26.       The strong linear character of Madeira Terrace is only currently interrupted by the existing Shelter Hall lift and the existing staircases. The lantern top to the new lift would result in a break in the Marine Parade railings and would be clearly and prominently visible from the Marine Parade street-scene and from various nearby points within the East Cliff Conservation Area to the north of the site. The Heritage Team highlight a low adverse heritage impact in these interventions that would need to be balanced against the benefits of the scheme.

 

9.27.       The Heritage Team support the contemporary approach to the design which would be deliberately lower than the historic lift and less prominent in appearance when viewed collectively but would still reference the proportions and materials of the existing historic lift. It is appreciated that the proposed lift would be a significant intervention impacting on the historic terrace structure itself, however it is considered that the location of the new lift is legible, the mid- level railings and round level arched arcade would cut across the set-back tower to retain repetitive horizontal detailing, and that the length and scale of the wider terrace structure could successfully accommodate such an intervention visually from longer distance views.

 

9.28.       Historic England have highlighted a level of harm towards the lower end of less than substantial harm caused by the introduction of the new lift. However, they have regard to the extensive design process the proposal has undertaken, the historical materiality in the design as well as the need to ensure a robust and long-lasting structure. The use of brick for the lift shaft and the copper would relate back to the original Lockwood lift design. Historic England have stated that the identified harm would be considerably outweighed by the public benefits of the scheme in terms of meaningful repairs, improvements to accessibility, and regenerating this part of the eastern seafront.

 

Terrace Deck:

9.29.       The existing Terrace structure has a concrete deck covered by an asphalt layer that has worsened in condition overtime with movement joints added that have corroded. Given the reduced significance and its condition, it is not considered appropriate to repair and is instead proposed to be replaced with the lattice breams underneath retained. This would also allow improved weatherproofing and removal of ironwork for assessment to be retained. The proposed concrete deck would have a natural stone aggregate finish. Concrete has been chosen given the longevity and robustness it would provide. The Heritage Team highlight a neutral impact in this part of the scheme, with the change in construction with pre-cast units balanced with the removal of disfiguring patchy asphalt enabling an enhancement of the greater heritage value within the restoration of the ironwork.

 

9.30.       Historic England have stated that the replacement of the concrete deck would not cause any significant harm to the listed structure as it is in a very poor condition, unable to perform its structural function and holds limited significance because it is a typical of this form of construction.

 

9.31.       The original continuous timber seating fixed to the cliff face would be restored and incorporated into the wider public realm proposals for the upper deck which include island planting beds, seasonal canopies, low level LED lighting, and further seating. Overall these are considered to be modest additions to the historic elements, and further details of the public realm and landscaping on the terrace deck are required by condition. The proposed seasonal canopies are considered acceptable in principle, however further details are required by condition to ensure they have limited visual impact on the appearance of the terrace when they are in place during the summer months.

 

9.32.       The cast iron balustrade is currently under 1m in height and is therefore required to be raised in height by 135mm to ensure it complies with building regulation standards of above 1.1m in height. This will be carried out by retaining the existing balustrades and attaching on top of new concrete upstands. This is considered to be a discrete alteration that would not significantly harm the historic value of the structure. The proposal is to retain the current colour scheme, and this is conditioned.

 

Existing/New stairs:

9.33.       As the Shelter Hall lift would only provide access between Marine Parade and deck level, the proposal includes new stairs adjacent to Shelter Hall lift in order to provide access on the eastern side of the site between deck level and lower-level walkway/Madeira Drive. It is considered that this would have only a minor impact in terms of loss of ironwork of the existing structure and interruption of the linear character. The proposed balustrade and detailing would have regard to historic locality, with panels to be solid to meet safety regulations. Overall the new steps are considered an appropriate addition and further details of the stairs and brick underside would be required by condition.

 

9.34.       The proposed alterations to existing eastern flight of the Royal Crescent Steps (to the western end of the site) are required in order to improve safety, with new handrails with lighting incorporated, refurbishment of existing cast iron balustrade (with steel plate and concrete upstand to be added), timber handrail and concrete treads (with new contrasting nosing's added). The existing steps are steep and narrow, and therefore upgrades to improve safety are welcomed with no heritage harm as a result, subject to further details required by condition.

 

Lower-Level Walkway:

9.35.       Existing concrete/terrazzo paving has historical elements however they have been unmaintained, and retention of the surviving paving is not considered possible.

 

9.36.       The proposals would reflect the original role of the lower-level promenade as a space for shelter under the terrace structure, as a continuous walkway, and as an area of public realm with low level shrubs, LED lighting to the underside of the lattice beams, new seating with uplighters, and hardstanding. The proposals would reintroduce planted zone landscaping that would delineate the edge of the lower walkway and would assist with surface water drainage. Further details of the public realm enhancements, including lighting fixings and fittings (to ensure no adverse impact to the heritage value of the structure) would be required by condition.

 

9.37.       Parking spaces would be removed to accommodate the new crossing points and improve connectivity to Madeira Drive and the beach beyond, which would also provide an improved setting for the listed asset. Contemporary Brighton branded totems are proposed in the locality, and wall mounted signs within the site, which are also welcomed subject to condition to confirm details including design and siting.

 

Impact on Other Nearby Heritage Assets:

9.38.       The proposed lift would result in a loss of section of the seafront railings on Marine Parade to enable access and the tower structure would break the uninterrupted stretch of railings in this section. However, there are other breaks in the railings at entrances to existing steps and lift, and therefore o significant harm would be caused here. Taking into consideration contextual views and separation distances, it is considered the proposals would not have any significant impact on the nearby listed terrace properties, the setting of the listed lamp columns or the nearby seafront shelter.

 

9.39.       The proposals would result in repair and restoration of historic elements within the site that are important to the character of the wider East Cliff Conservation Area and are therefore considered to have a significant beneficial impact in this regard.

 

 

10.            CONCLUSION

 

10.1.       These proposals have been shaped by the outcome of public consultation and would provide benefit to the wider community. Overall, given the historic presence of the site being used for communal activities and events, the proposals to increase activity levels and footfall are welcomed.

 

10.2.       The proposed restoration of the Madeira terrace structure would optimise retention of the original components where possible for heritage purposes, but also reduce carbon footprint. Historic England welcome this first phase of work which would start a process to repair and restore Madeira Terrace and bring it back into use so that it can be enjoyed by the public once more.

 

10.3.       The proposed new lift and restoration of the existing Shelter Hall lift would be welcomed improvements to the accessibility through the site and the connectivity to the wider seafront public realm and residential areas to the north. The Heritage Team fully support the proposals, subject to further detail to be submitted by condition. Historic England support the significant heritage benefits associated with the restoration, which is considered to outweigh the low level of harm of the proposed lift intervention. The scheme is considered acceptable in terms of any heritage impact to the historic fabric and environment including the listed assets and the identified Conservation Areas. Any adverse impact is considered to be outweighed against the significant public gain of bringing this part of the terrace back into use, as well as the heritage gain of ensuring the future of the historic structure through its repair.

 

10.4.       Improvements to the public realm in this section of the seafront are welcomed. The proposal represents an opportunity to enhance the present situation in respect of the designated heritage assets and the surrounding public realm, as well as improving on the connectivity around the site.

 

10.5.       The design details of the proposal required by condition are necessary to ensure the acceptability of the scheme., Details of management and future maintenance of the scheme are required by condition.

 

 

11.            EQUALITIES

 

11.1.       The proposals have given consideration in the design to be compliant with Building Regulation performance indicators, including access solutions to provide safe and enhanced access for the current proposals and for future development of the wider site. The pedestrian routes with new lift and restoration of historic lift would provide step free access within the site and beyond.